Innovative solutions for system flexibility: renewables production, storage and system integration
-
TRI
TRl 2:Enhanced zero emission Power Technologies
-
Call Module
-
Funded Year
2020
Additional project requirements
2.1 Consortium composition project requirements
This joint Call Module deviates from the standard requirements regarding the consortium composition since it is devoted also to extra-European countries participation (countries outside the EU and not associated to Horizon Europe).
2.2 Project duration
The expected project duration is 36 months maximum, but taking into account that small projects may have a shorter duration.